Text of § 13-1-122.4

procedure.

A. The selection procedure shall use a competitive sealed qualifications-based

proposal method that conforms with Sections 13-1-111 through 13-1-117 NMSA 1978

and results in a professional services contract. The contract scope of work shall be

divided into two separate but related phases:

(1)

phase one for design consultation and preconstruction services; and

(2)

phase two for project construction.

B. The department shall issue a separate request for proposals for each project that

uses a construction manager general contractor delivery method.

C. The department's request for proposals for a construction manager general

contractor contract shall contain, at a minimum, the following elements:

(1)

a statement of the minimum qualifications for the construction manager

general contractor, including requirements for:

(a) a contractor's license for the type of work to be performed, issued

pursuant to the Construction Industries Licensing Act [Chapter 60, Article 13 NMSA

1978];

(b) registration pursuant to Section 13-4-13.1 NMSA 1978;

(c) minimum bond capacity;

(d) the ability to self-perform, with its own organization, a minimum

percentage of construction work as required and defined in the department's standard

specifications for highway and bridge construction, current edition; and

(e) current registration as a prequalified contractor pursuant to rule

promulgated by the department;

(2)

the procedures for submitting proposals, the criteria for evaluation of

qualifications and the relative weight of the criteria;

(3)

the form of contract to be awarded;

(4)

a listing or description of the types of preconstruction and construction

services that will be required;

(5)

identification of requirements for liability insurance, a proposal bond

pursuant to Section 13-1-146 NMSA 1978 and performance and payment bonds

pursuant to Section 13-4-18 NMSA 1978;

(6)

a description of the method to be used for pricing or negotiation of

construction manager general contractor fees for the scope of services; and

(7)

preferences as allowed by law in the Procurement Code for New-Mexico-

based businesses and others.

D. The department shall use a selection committee for the evaluation of the

qualifications submitted by offerors and shall determine the offerors that qualify for

award of the construction manager general contractor contract. The department shall

establish a construction manager general contractor selection committee by rule. The

selection committee shall rank the offerors and provide a recommendation to the

department identifying the offeror most qualified based on the highest ranking score.

E. Nothing in this section precludes the selection committee from recommending

the termination of the selection procedure pursuant to Section 13-1-131 NMSA 1978.

F. The department shall promulgate rules for the selection process and award of

contract that include interviews with top-ranked offerors, price negotiations and the

authority to terminate negotiations.

G. The department rules shall address the processes applicable to the award of a

contract for construction management and construction services, including the process

for conducting contract negotiations with the construction manager general contractor

for construction of the project or work packages associated with the project in

accordance with contract documents and specifications.

H. The department shall secure and use an independent cost estimate for the

project or each work package associated with the project to validate the negotiated

costs for the construction management and construction services contract. The

independent cost estimate shall remain confidential until notice of award of the

construction contract.

I. The construction manager general contractor shall submit a guaranteed

maximum price proposal for construction management and construction services for the

project or work packages associated with the project.

J. Negotiations may begin between the department and the construction manager

general contractor for the construction services before completion of the design work.

Upon successful negotiation, the department shall execute the contract with the

construction manager general contractor for construction of the project or work

packages associated with the project.

K. Negotiations shall be terminated if the department is unable to reach a price

agreement with the construction manager general contractor. In the event that

negotiations are terminated, the department may competitively bid the construction

phase of the project, in accordance with the department's procedures applicable to

public works construction projects. The construction manager general contractor may

be allowed to bid or provide subcontract services for the project, unless prohibited by

Section 10-16-13 NMSA 1978.

L. Data developed during the design services and the construction manager

general contractor's preconstruction services, unless otherwise protected by law, shall

be made available to all bidders.

M. After a construction manager general contractor contract is awarded for the

preconstruction services, the department shall make the names of each offeror and the

ranking and evaluation scores for each available for public inspection.

Cite this section