N.M. Stat. § 13-1-122.3
Construction manager general contractor delivery
Text of § 13-1-122.3
method authorized.
A. The secretary may use a construction manager general contractor delivery
method on a project if the department makes a written determination that it is
appropriate and in the best interest of the department to use this method of project
delivery to procure an eligible project. The determination to use the construction
manager general contractor delivery method shall be issued only after the department
considers the following criteria, at a minimum:
(1)
the level of design and the extent to which the project requirements have
been or can be adequately defined;
(2)
time constraints for project delivery;
(3)
project complexity;
(4)
the suitability of use of the construction manager general contractor
delivery method; and
(5)
the capability of the department to manage the project, including
experienced personnel or outside consultants.
B. The secretary shall not make a determination to use a construction manager
general contractor delivery method unless the project is posted with such determination
on the department's website for at least ninety days.
C. The secretary, in consultation with the professional associations and contractors
from within the highway design and construction industry, shall promulgate rules for
solicitation and award of construction manager general contractor contracts. The rules
shall establish criteria for selecting, procuring and contracting a project using the
construction manager general contractor delivery method. The rules shall define the
scope of the construction manager general contractor contract to require the
construction manager general contractor to:
(1)
provide a range of preconstruction services and participate in project
design, cost control, scheduling and value engineering efforts for the project; and
(2)
if the second phase of the contract is entered into, provide the
construction work for the project or work packages associated with the project at a
guaranteed maximum price for which the construction manager general contractor is
financially responsible.