LawCensus
California Public Resources Code

California Public Resources Code § 25514.5

Cal. Pub. Res. Code § 25514.5 · Last amended 1984 · Text from the 2026.09.1 snapshot

Text of § 25514.5

In considering the acceptability of a site proposed to accommodate ultimately additional power-generating capacity, the commission, in determining, pursuant to Sections 25514 and 25512, the conformity of the facilities proposed in the notice with the 12-year forecast of statewide and service area electric power demands adopted pursuant to subdivision (e) of Section 25305, shall base its determination only on such initial facilities as are proposed for operation within the forthcoming 12-year period. Additional facilities projected to be operating at the site at a time beyond the forthcoming 12-year period shall not be considered in the determination of conformity with the electric power demand forecast.

Cite this section

Cal. Pub. Res. Code § 25514.5

https://lawconsensus.com/codes/california/public-resources-code/25514-5/

LawCensus reproduces the text of the law for reference. It may not show the most recent changes. Check the official source before you rely on it: official text. This is general information, not legal advice.