LawCensus
Wisconsin Statutes

Wis. Stat. § 196.496

Distributed generation facilities

Wis. Stat. § 196.496 · Last amended 2001 · Text from the 2026.09.1 snapshot

Text of § 196.496

(1) Definition. In this section, “distributed generation facility” means a facility for the generation of electricity with a capacity of no more than 15 megawatts that is located near the point where the electricity will be used or is in a location that will support the functioning of the electric power distribution grid.

(2) Rules. The commission shall promulgate rules establishing standards for the connection of distributed generation facilities to electric distribution facilities. To the extent technically feasible and cost effective, the standards shall be uniform and shall promote the development of distributed generation facilities. The standards shall address engineering, electric reliability, and safety concerns and the methods for determining charges for interconnection.

History: 2001 a. 16.

Cite this section

Wis. Stat. § 196.496

https://lawconsensus.com/codes/wisconsin/chapter-196/196-496/

LawCensus reproduces the text of the law for reference. It may not show the most recent changes. Check the official source before you rely on it: official text. This is general information, not legal advice.