RCW 68.24.180
Opening of roads, railroads through cemetery—Consent required
Text of § 180
After dedication under this title, and as long as the property remains dedicated to cemetery purposes, a railroad, street, road, alley, pipe line, pole line, or other public thoroughfare or utility shall not be laid out, through, over, or across any part of it without the consent of the cemetery authority or of not less than two-thirds of the owners of plots or rights of interment.
Cite this section
RCW 68.24.180
https://lawconsensus.com/codes/washington/title-68/68-24-180/
LawCensus reproduces the text of the law for reference. It may not show the most recent changes. Check the official source before you rely on it: official text. This is general information, not legal advice.