Text of § 240

(1) After a blast is fired, loosened pieces of rock shall be scaled from the sides of the excavation and after the blasting is completed, the entire working chamber shall be thoroughly scaled. (2) The person in charge shall inspect the working chamber and have all loose rock or ground removed and the chamber made safe before proceeding with the work. (3) Drilling must not be started until all remaining butts of old holes are examined for unexploded charges.

Cite this section

RCW 49.24.240

https://lawconsensus.com/codes/washington/title-49/49-24-240/

LawCensus reproduces the text of the law for reference. It may not show the most recent changes. Check the official source before you rely on it: official text. This is general information, not legal advice.