Verification of subcontractor responsibility criteria

RCW 39.06.020 · Last amended 2023 · Text from the 2026.09.1 snapshot

Text of § 020

A public works contractor must verify responsibility criteria for each first tier subcontractor, and a subcontractor of any tier that hires other subcontractors must verify responsibility criteria for each of its subcontractors. Verification shall include that each subcontractor, at the time of subcontract execution, meets the responsibility criteria listed in RCW 39.04.350 (1) and possesses an electrical contractor license, if required by chapter 19.28 RCW, an elevator contractor license, if required by chapter 70.87 RCW, or a plumbing contractor license[,] if required by chapter 18.106 RCW. This verification requirement, as well as the responsibility criteria, must be included in every public works contract and subcontract of every tier.

Cite this section

RCW 39.06.020

https://lawconsensus.com/codes/washington/title-39/39-06-020/

LawCensus reproduces the text of the law for reference. It may not show the most recent changes. Check the official source before you rely on it: official text. This is general information, not legal advice.