LawCensus
Texas Statutes

Tex. Natural Resources Code § 120.001

DEFINITIONS

Tex. Natural Resources Code § 120.001 · Last amended 2013 · Text from the 2026.09.1 snapshot

Text of § 120.001

In this chapter:

(1) "Bureau" means the Bureau of Economic Geology of The University of Texas at Austin.

(2) "Clean energy project" means a project to construct a coal-fueled, natural gas-fueled, or petroleum coke-fueled electric generating facility, including a facility in which the fuel is gasified before combustion, that will:

(A) have a capacity of at least 200 megawatts;

(B) meet the emissions profile for an advanced clean energy project under Section 382.003(1-a)(B), Health and Safety Code;

(C) capture at least 70 percent of the carbon dioxide resulting from or associated with the generation of electricity by the facility;

(D) be capable of permanently sequestering in a geological formation the carbon dioxide captured; and

(E) be capable of supplying the carbon dioxide captured for purposes of an enhanced oil recovery project.

(3) "Commission" means the Railroad Commission of Texas.

(4) "Sequester" means to inject carbon dioxide into a geological formation in a manner and under conditions that create a reasonable expectation that at least 99 percent of the carbon dioxide injected will remain sequestered from the atmosphere for at least 1,000 years.

Cite this section

Tex. Natural Resources Code § 120.001

https://lawconsensus.com/codes/texas/natural-resources-code/120-001/

LawCensus reproduces the text of the law for reference. It may not show the most recent changes. Check the official source before you rely on it: official text. This is general information, not legal advice.