LawCensus
Oregon Revised Statutes

ORS 541.677

Target outcomes for scoring and ranking criteria

ORS 541.677 · Last amended 2025 · Text from the 2026.09.1 snapshot

Text of § 541.677

541.677 Target outcomes for scoring and ranking criteria. (1) The Water Resources Commission shall design the minimum criteria for the project scoring and ranking system described in ORS 541.669 to achieve the following outcomes:

(a) Issuing grants or loans only to projects that provide benefits in each of the three categories of public benefit described in ORS 541.673.

(b) Preferring partnerships and collaborative projects.

(c) Funding projects of diverse sizes, types and geographic locations.

(d) If a project proposes to divert water, preferring projects that provide a measurable improvement in protected streamflows.

(e) If a project proposes to increase efficiency, preferring projects that provide a measurable increased efficiency of water use.

(2) The commission shall periodically review the loan and grant program to assess to what extent the loan and grant program is achieving desired outcomes and providing public benefits.

(3) The commission shall modify the project selection process as necessary to better achieve the desired outcomes described in subsection (1) of this section. [2013 c.784 §9; 2025 c.82 §9]

Note: See note under 541.651.

Cite this section

ORS 541.677

https://lawconsensus.com/codes/oregon/title-45/541-677/

LawCensus reproduces the text of the law for reference. It may not show the most recent changes. Check the official source before you rely on it: official text. This is general information, not legal advice.