LawCensus
Ohio Revised Code

Ohio Rev. Code § 4957.12

Preparation of plans and specifications

Ohio Rev. Code § 4957.12 · Last amended 1953 · Text from the 2026.09.1 snapshot

Text of § 4957.12

October 1, 1953 House Bill 1 - 100th General Assembly The legislative authority of a municipal corporation, for the purpose of making or causing a crossing improvement to be made, by ordinance may require the railroad company, in co-operation with the engineer of the municipal corporation, or the engineer designated in such ordinance, to prepare and submit to such legislative authority, within three months unless longer time is mutually agreed upon in writing, plans and specifications for such improvement, specifying the number, character, and location of all piers and supports which are to be permanently placed in any street or way in such municipal corporation, specifying the grades to be established for the streets and the height, character, and estimated cost of any viaduct or way above or below any railroad track, and the change of grade required to be made of such tracks, including the sidetracks and switches. In changing the grade of any railroad, no grade shall be required to exceed the established maximum or ruling grade governing the operations of engines of that division or part of the railroad on which the improvement is to be made, without the consent of the company, nor shall the company's tracks or such highway, street, or way, be required to be placed below high-water mark.

Cite this section

Ohio Rev. Code § 4957.12

https://lawconsensus.com/codes/ohio/title-49/4957-12/

LawCensus reproduces the text of the law for reference. It may not show the most recent changes. Check the official source before you rely on it: official text. This is general information, not legal advice.