A. By regulation, the environmental improvement board or the local board shall

require:

(1)

a person intending to construct or modify any source, except as otherwise

specifically provided by regulation, to obtain a construction permit from the department

or the local agency prior to such construction or modification; and

(2)

a person intending to operate any source for which an operating permit is

required by the 1990 amendments to the federal act, except as otherwise specifically

provided by regulation, to obtain an operating permit from the department or the local

agency.

B. Regulations adopted by the environmental improvement board or the local board

shall include at least the following provisions:

(1)

requirements for the submission of relevant information, including

information the department or the local agency deems necessary to determine that

regulations and standards under the Air Quality Control Act or the federal act will not be

violated;

(2)

specification of the deadlines for processing permit applications; provided

that the deadline for a final decision by the department or the local agency on a

construction permit application may not exceed:

(a) ninety days after the application is determined to be administratively

complete, if the application is not subject to requirements for prevention of significant

deterioration, unless the secretary or the director grants an extension not to exceed

ninety days for good cause, including the need to have public hearings; or

(b) one hundred eighty days after the application is determined to be

administratively complete, if the application is subject to requirements for prevention of

significant deterioration, unless the secretary or the director grants an extension not to

exceed ninety days for good cause, including the need to have public hearings;

(3)

that if the department or local agency fails to take final action on a

construction permit application within the deadlines specified in Paragraph (2) of this

subsection, the department or local agency shall notify the applicant in writing that an

extension of time is required to process the application and specify in detail the grounds

for the extension;

(4)

a description of elements required before the department or local agency

shall deem an application administratively complete;

(5)

specification of the public notice, comment period and public hearing, if

any, required prior to the issuance of a permit; provided that the permit regulations

adopted:

(a) by the environmental improvement board shall include provisions

governing notice to nearby states; and

(b) by any local board shall include provisions requiring that notice be given to

the department of all permit applications by any source that emits, or has a potential

emission rate of, one hundred tons per year or more of any regulated air contaminant,

including any source of fugitive emissions of each regulated air contaminant, at least

sixty days prior to the date on which construction or major modification is to commence;

(6)

a schedule of construction permit fees sufficient to cover the reasonable

costs of:

(a) reviewing and acting upon any application for such permit; and

(b) implementing and enforcing the terms and conditions of the permit,

excluding any court costs or other costs associated with an enforcement action;

(7)

a schedule of emission fees consistent with the provisions of Section

502(b)(3) of the 1990 amendments to the federal act;

(8)

a method for accelerated permit processing that may be requested at the

sole discretion of the applicant at the time the applicant submits a construction permit

application and that:

(a) allows the department or local agency to contract with qualified outside

firms to assist the department or local agency in its accelerated review of the

construction permit application; provided that the department or local agency can

contract with a qualified firm that does not have a conflict of interest; and

(b) establishes a process for the department or local agency to account for

the expenditure of the accelerated permit processing fees;

(9)

allowance for additional permit application fees, sufficient to cover the

reasonable costs of an accelerated permit application review process. Before the

applicant is notified that the permit application has been determined to be complete, the

department or local agency shall give the applicant a reasonable estimate of costs of an

accelerated permit application review process;

(10)

specification of the maximum length of time for which a permit shall be

valid; provided that for an operating permit such period may not exceed five years; and

(11)

for an operating permit only:

(a) provisions consistent with Sections 502(b) and 505(b) of the federal act

providing: 1) notice to and review and comment by the United States environmental

protection agency; and 2) that if the department or local agency receives notice of

objection from the United States environmental protection agency before the operating

permit is issued, the department or the local agency shall not issue the permit unless it

is revised and issued under Section 505(c) of the federal act;

(b) provisions governing renewal of the operating permit; and

(c) specification of the conditions under which the operating permit may be

terminated, modified or revoked and reissued prior to the expiration of the term of the

operating permit.

C. Except as provided in Subsection O of this section, the department or the local

agency may deny any application for:

(1)

a construction permit if it appears that the construction or modification:

(a) will not meet applicable standards, rules or requirements of the Air Quality

Control Act or the federal act;

(b) will cause or contribute to air contaminant levels in excess of a national or

state standard or, within the boundaries of a local authority, applicable local ambient air

quality standards; or

(c) will violate any other provision of the Air Quality Control Act or the federal

act; and

(2)

an operating permit if the source will not meet the applicable standards,

rules or requirements pursuant to the Air Quality Control Act or the federal act.

D. The department or the local agency may specify conditions to any permit granted

under this section, including:

(1)

for a construction permit:

(a) a requirement that such source install and operate control technology,

determined on a case-by-case basis, sufficient to meet the standards, rules and

requirements of the Air Quality Control Act and the federal act;

(b) individual emission limits, determined on a case-by-case basis, but only as

restrictive as necessary to meet the requirements of the Air Quality Control Act and the

federal act or the emission rate specified in the permit application, whichever is more

stringent;

(c) compliance with applicable federal standards of performance;

(d) reasonable restrictions and limitations not relating to emission limits or

emission rates; or

(e) any combination of the conditions listed in this paragraph; and

(2)

for an operating permit, terms and conditions sufficient to ensure

compliance with the applicable standards, rules and requirements pursuant to the Air

Quality Control Act and the federal act.

E. This section does not authorize the department or the local agency to require the

use of machinery, devices or equipment from a particular manufacturer if the federal

standards of performance, state regulations and permit conditions may be met by

machinery, devices or equipment otherwise available.

F. The issuance of a permit does not relieve any person from the responsibility of

complying with the provisions of the Air Quality Control Act and any applicable

regulations of the environmental improvement board or the local board. Any conditions

placed upon a permit by the department or the local agency shall be enforceable to the

same extent as a regulation of its board.

G. A person who participated in a permitting action before the department or the

local agency shall be notified by the department or the local agency of the action taken

and the reasons for the action. Notification of the applicant shall be by certified mail.

H. A person who participated in a permitting action before the department or the

local agency and who is adversely affected by such permitting action may file a petition

for hearing before the environmental improvement board or the local board. The

petition shall be made in writing to the environmental improvement board or the local

board within thirty days from the date notice is given of the department's or the local

agency's action. Unless a timely petition for hearing is made, the decision of the

department or the local agency shall be final.

I. If a timely petition for hearing is made, the environmental improvement board or

the local board shall hold a hearing within sixty days after receipt of the petition. The

environmental improvement board or the local board shall notify the petitioner and the

applicant or permittee, if other than the petitioner, by certified mail of the date, time and

place of the hearing. If the subject of the petition is a permitting action deemed by the

environmental improvement board or the local board to substantially affect the public

interest, the environmental improvement board or the local board shall ensure that the

public receives notice of the date, time and place of the hearing. The public in such

circumstances shall also be given a reasonable opportunity to submit data, views or

arguments orally or in writing and to examine witnesses testifying at the hearing. Any

person submitting data, views or arguments orally or in writing shall be subject to

examination at the hearing.

J. The environmental improvement board or the local board may designate a

hearing officer to take evidence in the hearing. All hearings shall be recorded.

K. The burden of proof shall be upon the petitioner. Based upon the evidence

presented at the hearing, the environmental improvement board or the local board shall

sustain, modify or reverse the action of the department or the local agency respectively.

L. Notwithstanding any other provision of law and subject to the provisions of

Section 74-2-4 NMSA 1978, a final decision on a permit by the department, the

environmental improvement board, the local agency, the local board or the court of

appeals that a source will or will not meet applicable local, state and federal air pollution

standards and regulations shall be conclusive and is binding on every other state

agency and as an issue before any other state agency shall be deemed resolved in

accordance with that final decision.

M. Subject to the provisions of Section 74-2-4 NMSA 1978, if the local board has

adopted a permit regulation pursuant to this section, persons constructing or modifying

any source within the boundaries of the local authority shall obtain a permit from the

local agency and not from the department.

N. Fees collected pursuant to this section shall be deposited in:

(1)

the state air quality permit fund created by Section 74-2-15 NMSA 1978 if

collected by the department; or

(2)

a fund created pursuant to Section 74-2-16 NMSA 1978 if collected by a

local agency pursuant to a permit regulation adopted by the local board pursuant to this

section.

O. The department may not deny an application for a construction permit for a

cotton gin if the applicant proposes use of the best system of emissions reduction

currently in use by cotton gins in the United States, as specified by regulation of the

environmental improvement board, and the cotton gin has a potential emission rate,

considering the use of the proposed emissions reduction system and the proposed

hours of operation, of not more than fifty tons per year of any regulated air contaminant

for which there is a national ambient air quality standard. The construction permit shall

require that the applicant use the proposed emission reduction system and limit the

hours of operation to the hours specified in the application. For purposes of this

subsection, "best system of emissions reduction" for cotton gins means a system that

will result in emissions reduction equal to or greater than that obtained by the use of

condenser screens, seventy-mesh screen or equivalent on low-pressure exhausts and

high-efficiency cyclone dust collectors on high-pressure exhausts.

P. The department or local agency may deny any permit application or revoke any

permit issued pursuant to the Air Quality Control Act if, within ten years immediately

preceding the date of submission of the permit application, the applicant or permittee

has:

(1)

knowingly misrepresented a material fact in an application for a permit;

(2)

refused to disclose the information required by the provisions of the Air

Quality Control Act;

(3)

been convicted in any court of any state or the United States of:

(a) a felony related to environmental crime; or

(b) a crime defined by state or federal statute as involving or being in restraint

of trade, price fixing, bribery or fraud;

(4)

constructed or operated a facility for which a permit is sought without a

permit required by the Air Quality Control Act, except when such an unpermitted facility

is discovered after acquisition in the course of a timely environmental audit authorized

by department or local board policy and except if:

(a) the operator of the facility using good engineering practices and

established approved calculation methodologies estimated that the facility's emissions

would not require a permit pursuant to the Air Quality Control Act; and

(b) upon discovery of the discrepancy between the calculated pre-

construction maximum facility emissions and the calculated post-construction maximum

facility emissions, the operator of the facility applies for the appropriate permit within

thirty calendar days; or

(5)

had any permit revoked or permanently suspended for cause under the

environmental laws of any state or the United States.

Q. In making a finding under Subsection P of this section, the department or local

agency may consider aggravating and mitigating factors.

R. If an applicant or permittee whose permit is being considered for denial or

revocation on any basis provided by Subsection P of this section has submitted an

action plan that has been approved in writing by the secretary or director, and plan

approval includes a period of operation under a conditional permit that will allow the

applicant or permittee a reasonable opportunity to demonstrate its rehabilitation, the

secretary or director may issue a conditional permit for a reasonable period of time.

S. An applicant for a permit pursuant to the Air Quality Control Act shall file a

disclosure statement with the department or local agency with the information listed in

Subsection P of this section, and on a form developed by the department. An existing

permit holder shall provide such disclosure upon request by the department or local

agency.