LawCensus
New Mexico Statutes

N.M. Stat. § 73-11-13

[Local improvements; petition; bond for costs of

N.M. Stat. § 73-11-13 · Last amended 1931 · Text from the 2026.09.1 snapshot

Text of § 73-11-13

investigation; dismissal of petition.]

Any desired special construction, reconstruction, betterment or improvement in an

irrigation system, including drainage (and protection from arroyo floods or

encroachment of arroyo fans, river rectification and control, river bank protection,

construction of levees and jetties), which are for the special benefit of certain

agricultural lands tributary thereto and lying within the geographical boundaries of an

irrigation district, may be constructed, or improvements already constructed for similar

or the same purposes may be purchased or acquired, and provision made to meet the

cost thereof as follows:

the holders of title or evidence of title of one-quarter of the acreage proposed to be

assessed may file with the board of directors of the irrigation district their petition

reciting the nature and general plan of the desired improvement and specifying the

lands proposed to be specially taxed therefor. Such petition shall be accompanied by a

bond in the sum of one hundred ($100) dollars, with the surety to be approved by the

said board of directors, conditioned that the petitioners will pay the cost of the

investigation of the project and the hearing thereon if the same be not established. Said

board may, at any time, require a bond in an additional sum, as may be deemed

advisable. Upon the filing of such petition the board of directors, with the assistance of a

competent engineer, shall make an investigation of the feasibility, cost and need of the

proposed local improvement, together with the ability of the land to pay such costs, and

if the same appears feasible they shall have a plan and estimate of the cost thereof

prepared. If the cost shall appear to the board to exceed the benefits to accrue

therefrom, or if the land proposed to be embraced within the local improvement district

shall be found to be insufficient security for the return of the cost, or if a protest against

the establishment of the proposed improvement, signed by a majority of the holders of

title in the proposed local improvement district, be presented at or prior to the hearing

herein provided for, or if in other respects the proposed local improvement district

should be found not feasible, they shall hold such petition for organization for naught,

and dismiss the same at the expense of the petitioners.

Cite this section

N.M. Stat. § 73-11-13

https://lawconsensus.com/codes/new-mexico/chapter-73/73-11-13/

LawCensus reproduces the text of the law for reference. It may not show the most recent changes. Check the official source before you rely on it: official text. This is general information, not legal advice.