LawCensus
New Mexico Statutes

N.M. Stat. § 72-5-1

Application for permit; rules; surveys, etc

N.M. Stat. § 72-5-1 · Last amended 1941 · Text from the 2026.09.1 snapshot

Text of § 72-5-1

Any person, association or corporation, public or private, the state of New Mexico or

the United States of America, except as provided in Section 15 [72-5-33 NMSA 1978] of

this act, hereafter intending to acquire the right to the beneficial use of any waters, shall,

before commencing any construction for such purposes, make an application to the

state engineer for a permit to appropriate, in the form required by the rules and

regulations established by him. Such rules and regulations, shall, in addition to

providing the form and manner of preparing and presenting the application, require the

applicant to state the amount of water and period or periods of annual use, and all other

data necessary for the proper description and limitation of the right applied for, together

with such information, maps, field notes, plans and specifications as may be necessary

to show the method of practicability of the construction and the ability of the applicant to

complete the same. The state engineer may require additional information not provided

for in the general rules and regulations, in any case involving the diversion of five

hundred cubic feet of water per second, or more, or in the construction of a dam more

than thirty feet high from the foundation. All such maps, field notes, plans and

specifications, shall be made from actual surveys and measurements, and shall be duly

filed in the office of the state engineer at the time of filing of formal application for permit

to appropriate; provided, that upon the filing in the office of the state engineer of a notice

of intention to make formal application for a permit to appropriate certain public waters

the state engineer may allow a reasonable time, to be specified by him and noted upon

his records, for making the surveys, measurements, maps, plans and specifications

hereinbefore provided and required for a formal application, and if applicant shall file

such formal application and map, plans and specifications and other necessary data

within the time so specified, his priority of application shall date from the time of filing

such notice of intention.

Cite this section

N.M. Stat. § 72-5-1

https://lawconsensus.com/codes/new-mexico/chapter-72/72-5-1/

LawCensus reproduces the text of the law for reference. It may not show the most recent changes. Check the official source before you rely on it: official text. This is general information, not legal advice.