LawCensus
New Mexico Statutes

N.M. Stat. § 72-2-6

Fees; amount; disposition

N.M. Stat. § 72-2-6 · Last amended 1987 · Text from the 2026.09.1 snapshot

Text of § 72-2-6

The state engineer shall receive the following fees to be paid by him into the general

fund:

A. for filing notice of intention to make formal application for permit to appropriate

surface water, twenty-five dollars ($25.00), which shall be paid at the time of filing notice

of intention;

B. for filing a formal application for permit to appropriate water where the project is

chiefly for diversion and direct use of the water, twenty-five dollars ($25.00) if the

amount claimed does not exceed five cubic feet of water per second, and five dollars

($5.00) for each cubic foot per second in excess of five; or, if the project is chiefly for

storage of excess and flood waters, ten dollars ($10.00) for each one thousand acre-

feet or fraction thereof of storage capacity; or, if the project is for power purposes only,

in which the water is returned to the river bed in substantially undiminished quantity,

twenty-five dollars ($25.00), if the amount claimed does not exceed five cubic feet of

water per second, and one dollar ($1.00) for each cubic foot per second of time in

excess of five; provided, however, that if application for permit is preceded by a notice

of intention, the fee accompanying the notice of intention shall be applied on the

subsequent fees. Fees included under this subsection, which shall be paid to the state

engineer at the time of filing formal application for permit, shall include the filing of

maps, plans, specifications, field notes, proof of publication and all other papers relating

to the application, up to the issuing of the permit to appropriate water, and shall include

the examination and study of all data therein with the exception of plans and

specifications, for the examination and study of which additional fees shall be collected

as prescribed in this section;

C. for examining in connection with any water right application the plans and

specifications for a dam, two dollars ($2.00) for each one thousand dollars ($1,000) or

fraction thereof of the estimated cost of such dam; for examining the plans and

specifications for canal or other water conduit, twenty-five dollars ($25.00), where the

capacity does not exceed fifty cubic feet of water per second, and ten dollars ($10.00)

for each additional fifty cubic feet per second or fraction thereof. The fees shall be paid

to the state engineer before he issues the permit to appropriate water; provided that no

fee shall be paid for examining plans and specifications submitted by the United States

or any agency or department of the United States;

D. for issuing any certificate of construction or license to appropriate, twenty-five

dollars ($25.00);

E. for issuing a permit for an extension of time, fifty dollars ($50.00);

F. for issuing any miscellaneous water right instrument or copy of any water right

document filed in his office, one dollar ($1.00) for the first page thereof, and fifteen cents

($.15) for each additional page thereof;

G. for filing any other paper necessarily forming a part of the permanent record of

the water right application, permit or license, one dollar ($1.00);

H. for a contact reproduction of any map or plan sheet accompanying an application

for permit to appropriate water, three dollars ($3.00) for each sheet; for a negative of

any map or plan sheet suitable to reproduce copies thereof, five dollars ($5.00) for each

sheet;

I. for inspecting damsites, dams, irrigation systems or other construction work as

required by law, one hundred dollars ($100) per day and actual and necessary traveling

expenses. Fees for any inspection deemed necessary by the state engineer and not

paid on demand shall be a lien on any land or other property of the owner of the works

and may be recovered by the state engineer in any court of competent jurisdiction; and

J. for such other work as may be required of his office, such reasonable fees as in

the judgment of the state engineer the character and extent of the work justifies.

Cite this section

N.M. Stat. § 72-2-6

https://lawconsensus.com/codes/new-mexico/chapter-72/72-2-6/

LawCensus reproduces the text of the law for reference. It may not show the most recent changes. Check the official source before you rely on it: official text. This is general information, not legal advice.