LawCensus
New Mexico Statutes

N.M. Stat. § 72-14-11

Projects using revenue bond proceeds authorized

N.M. Stat. § 72-14-11 · Last amended 1997 · Text from the 2026.09.1 snapshot

Text of § 72-14-11

A. The commission is authorized to conduct, whenever it deems such project

expedient, any project, the cost of which is to be paid wholly by means of or with the

proceeds of revenue bonds authorized, or in connection with a grant to aid in financing

such project from the United States or any instrumentality or agency thereof, or with

other funds provided under the authority of Sections 72-14-9 through 72-14-28 NMSA

1978. If revenues from the project are intended to pay the cost of maintaining, repairing

and operating the project and to pay the principal and interest of revenue bonds that

may be issued for the cost of the project, before conducting any project, the commission

shall make estimates of the cost of the project, of the cost of maintaining, repairing and

operating the project and of the revenues to be derived from the project, and no such

project shall be conducted unless, according to the estimates, the revenues to be

derived will be sufficient to pay the cost of maintaining, repairing and operating the

project and, if no other revenues are to be pledged to repayment of bonds that may be

issued for the cost of the project, to pay the principal and interest of revenue bonds

which may be issued for the cost of such project; provided, however, that in connection

with the issuance of any of the bonds, the failure of the commission to make the

estimates required by this section or to make the estimates in proper form shall in no

way affect the validity or enforceability of any such bonds or of the trust indenture,

resolution or other security for the bonds.

B. The purpose of Sections 72-14-9 through 72-14-28 NMSA 1978 is to meet a

statewide need for the conservation and use of water through projects designed or

intended for such purposes. The commission is empowered to make such investigations

as may be necessary to plan and carry out a comprehensive statewide program of

water conservation; provided, however, that those sections shall not be construed to

repeal or amend by implication or otherwise the provisions of law enacted with respect

to permits for the acquisition of water rights, permits for the change in place or method

of use of water or permits for the construction of works. The projects to be finally

conducted shall qualify as parts of such statewide program and, if applicable shall be

approved by the commission upon the showing of their prospective ability to meet,

through the sale of water or other services, the cost of operation, maintenance and

repair and the amortization of the cost of the project; provided, however, that the failure

of the commission to determine such prospective ability of a project shall in no way

affect the validity or enforceability of any such bonds.

Cite this section

N.M. Stat. § 72-14-11

https://lawconsensus.com/codes/new-mexico/chapter-72/72-14-11/

LawCensus reproduces the text of the law for reference. It may not show the most recent changes. Check the official source before you rely on it: official text. This is general information, not legal advice.