A. The commission is authorized to conduct, whenever it deems such project
expedient, any project, the cost of which is to be paid wholly by means of or with the
proceeds of revenue bonds authorized, or in connection with a grant to aid in financing
such project from the United States or any instrumentality or agency thereof, or with
other funds provided under the authority of Sections 72-14-9 through 72-14-28 NMSA
1978. If revenues from the project are intended to pay the cost of maintaining, repairing
and operating the project and to pay the principal and interest of revenue bonds that
may be issued for the cost of the project, before conducting any project, the commission
shall make estimates of the cost of the project, of the cost of maintaining, repairing and
operating the project and of the revenues to be derived from the project, and no such
project shall be conducted unless, according to the estimates, the revenues to be
derived will be sufficient to pay the cost of maintaining, repairing and operating the
project and, if no other revenues are to be pledged to repayment of bonds that may be
issued for the cost of the project, to pay the principal and interest of revenue bonds
which may be issued for the cost of such project; provided, however, that in connection
with the issuance of any of the bonds, the failure of the commission to make the
estimates required by this section or to make the estimates in proper form shall in no
way affect the validity or enforceability of any such bonds or of the trust indenture,
resolution or other security for the bonds.
B. The purpose of Sections 72-14-9 through 72-14-28 NMSA 1978 is to meet a
statewide need for the conservation and use of water through projects designed or
intended for such purposes. The commission is empowered to make such investigations
as may be necessary to plan and carry out a comprehensive statewide program of
water conservation; provided, however, that those sections shall not be construed to
repeal or amend by implication or otherwise the provisions of law enacted with respect
to permits for the acquisition of water rights, permits for the change in place or method
of use of water or permits for the construction of works. The projects to be finally
conducted shall qualify as parts of such statewide program and, if applicable shall be
approved by the commission upon the showing of their prospective ability to meet,
through the sale of water or other services, the cost of operation, maintenance and
repair and the amortization of the cost of the project; provided, however, that the failure
of the commission to determine such prospective ability of a project shall in no way
affect the validity or enforceability of any such bonds.