N.M. Stat. § 72-12A-9
Plan of replacement; implementation and maintenance
Text of § 72-12A-9
amendment.
A. Upon approval of replacement, the permittee shall implement the plan with all
deliberate speed and within such time as will prevent impairment of existing water
rights.
B. If the owner of a water right protected by a plan of replacement asserts that the
permittee has failed or refused to implement or maintain the plan, such owner shall file a
written notice with the state engineer specifying the manner or method by which the
permittee has failed or refused to implement or maintain the plan. Upon the filing of
such notice, the state engineer may require the permittee to show cause why the permit
should not be suspended or terminated.
C. If the owner of a prior water right not previously protected by a plan of
replacement asserts that his water right is or may be impaired by the permittee's mine
dewatering, such owner shall file a written notice with the state engineer specifying the
manner or method by which the permittee's mine dewatering is or may impair his water
right. Upon the filing of such notice, the state engineer may require the permittee to
show cause why the permit should not be suspended or terminated pending submission
or amendment of a plan of replacement to provide protection against the claimed
impairment.
Cite this section
N.M. Stat. § 72-12A-9
https://lawconsensus.com/codes/new-mexico/chapter-72/72-12a-9/
LawCensus reproduces the text of the law for reference. It may not show the most recent changes. Check the official source before you rely on it: official text. This is general information, not legal advice.