N.M. Stat. § 72-12-23
Replacement well over one hundred feet from original
Text of § 72-12-23
well.
A. The owner of a water right may drill and use a replacement well drilled over one
hundred feet from his original well upon making application but without waiting for the
completion of the publication and hearing set out in Section 72-12-3 NMSA 1978 if:
(1)
the well is drilled into the same and only the same underground stream,
channel, artesian basin, reservoir or lake as the original well; and
(2)
the appropriation is of the same amount of water allowed by his water right
in the original well; and
(3)
an emergency situation exists in which the delay caused by publication
and hearing would result in crop loss or other serious economic loss; and
(4)
the state engineer, after a preliminary investigation, finds the change does
not impair existing water rights, and grants him a permit authorizing the drilling and use
of the replacement well prior to the publication and hearing.
B. When the preliminary investigation by the state engineer causes him to
reasonably believe that the drilling and use of a replacement well may impair existing
rights, then no permit shall be issued until after publication and hearing.
Cite this section
N.M. Stat. § 72-12-23
https://lawconsensus.com/codes/new-mexico/chapter-72/72-12-23/
LawCensus reproduces the text of the law for reference. It may not show the most recent changes. Check the official source before you rely on it: official text. This is general information, not legal advice.