LawCensus
New Mexico Statutes

N.M. Stat. § 71-9-4

Exclusion; incidental loss or extraction of heat; limited

N.M. Stat. § 71-9-4 · Last amended 2016 · Text from the 2026.09.1 snapshot

Text of § 71-9-4

exception.

A. A permit from the state engineer is not required for the use of ground water over

two hundred fifty degrees Fahrenheit as incident to the development of geothermal

resources permitted pursuant to the Geothermal Resources Development Act when:

(1)

the use does not require any diversion of ground water; or

(2)

all diverted ground water is reinjected as soon as practicable into the

same ground water source from which it was diverted, resulting in no new depletions to

the source; provided that:

(a) the division shall provide to the state engineer all information available to

the division regarding the proposed diversion and reinjection and shall request the

opinion of the state engineer as to whether existing ground water rights sharing the

same ground water source may be impaired; and

(b) if the state engineer determines that the information provided is sufficient

to render an opinion and it is the opinion of the state engineer that any existing ground

water rights may be impaired, the division, upon receipt of the opinion of the state

engineer, shall require the owner or operator to submit to the division a plan of

replacement with regard to any existing ground water rights that are likely to be

impaired.

B. In response to a request for opinion pursuant to Subsection A of this section, the

determination by the state engineer as to whether the information provided is sufficient

to render an opinion or the issuance by the state engineer of an opinion shall not

constitute a decision, act or refusal to act under Section 72-2-16 NMSA 1978.

C. No ground water right is established through the use of ground water as allowed

in Subsection A of this section.

D. As used in this section, "plan of replacement" means a detailed plan for the

replacement of water, which may include:

(1)

the furnishing of a substitute water supply;

(2)

the modification of existing water supply facilities;

(3)

the drilling of replacement wells;

(4)

the assumption of additional operating costs;

(5)

the procurement of documentation establishing a waiver of protection by

owners of affected water rights;

(6)

artificial recharge; or

(7)

any other means to avoid impairment of water rights.

Cite this section

N.M. Stat. § 71-9-4

https://lawconsensus.com/codes/new-mexico/chapter-71/71-9-4/

LawCensus reproduces the text of the law for reference. It may not show the most recent changes. Check the official source before you rely on it: official text. This is general information, not legal advice.