Text of § 71-11-1

A. The energy, minerals and natural resources department shall develop a roadmap

for grid modernization that shall detail priorities and strategies to modernize New

Mexico's electric grid.

B. The department shall establish a grid modernization grant program to support

implementation of a modern grid by providing grants to eligible projects proposed by:

(1)

municipalities and county governments;

(2)

state agencies;

(3)

state universities;

(4)

public schools;

(5)

post-secondary educational institutions; and

(6)

Indian nations, tribes and pueblos.

C. The department shall adopt rules establishing the application procedure, the

required qualifications for projects and the purposes for which the grant may be used.

In approving grants, consideration shall be given to:

(1)

the extent to which the project improves electrical system efficiency,

reliability, resilience and security; lowers operations and maintenance costs; and meets

energy demands through a flexible, diversified and distributed energy portfolio

consistent with New Mexico's energy goals;

(2)

the extent to which the project incorporates a new technology or a new or

innovative application of an existing technology that will provide useful information to the

state, utilities, electric cooperatives and the general public related to grid modernization;

(3)

the degree to which the project fosters the general public's, students' or a

specific government or industry sector's overall understanding and appreciation of the

benefits of modernizing the electric grid;

(4)

the extent to which the project complements or coordinates with the

resource planning of a public utility as required by the Public Utility Act [62-13-1 NMSA

1978]; and

(5)

the extent to which the project stimulates in-state economic development,

including the creation of jobs and apprenticeships.

D. Grants shall be awarded on a competitive basis, and priority shall be given to

proposals that use matching funds from non-state sources. The grant program shall

seek to fund applicants in each of the following categories:

(1)

an Indian nation, tribe or pueblo;

(2)

a rural community served by a rural electric cooperative;

(3)

a rural community served by an investor-owned public utility;

(4)

an urban or semi-urban municipality or county; and

(5)

an institution of higher education.

E. Projects receiving a grant from the grid modernization grant program shall be

required to be coordinated with the electric service provider that serves the entity in

order to ensure that the program does not adversely impact electrical system efficiency,

reliability, resilience and security.

F. The department shall provide a report on the grid modernization grant program to

the legislative finance committee prior to each regular legislative session. The report

shall include:

(1)

a list of grant recipients;

(2)

the amount and date of each grant;

(3)

a description of each project funded; and

(4)

a description of how each project contributes to grid modernization and

demonstrates increased electric grid reliability, resilience, security; creates economic

benefits; or pilots or demonstrates new technologies or new implementations of existing

technologies.

G. For the purposes of this section:

(1)

"department" means the energy, minerals and natural resources

department; and

(2)

"grid modernization" means improvements to electric distribution or

transmission infrastructure, including related data analytics equipment, that are

designed to accommodate or facilitate the integration of renewable electric generation

resources with the electric distribution grid or to otherwise enhance electric distribution

or transmission grid reliability, grid security, demand response capability, customer

service or energy efficiency or conservation and includes:

(a) advanced metering infrastructure that facilitates metering and providing

related price signals to users to incentivize shifting demand;

(b) intelligent grid devices for real time system and asset information at key

substations and large industrial customers;

(c) automated control systems for electric distribution circuits and substations;

(d) communications networks for service meters;

(e) distribution system hardening projects for circuits and substations

designed to reduce service outages or service restoration times;

(f) physical security measures at key distribution substations;

(g) cybersecurity measures;

(h) energy storage systems and microgrids that support circuit-level grid

stability, power quality, reliability or resiliency or provide temporary backup energy

supply;

(i) electrical facilities and infrastructure necessary to support electric vehicle

charging systems;

(j) new customer information platforms designed to provide improved

customer access, greater service options and expanded access to energy usage

information; and

(k) other new technologies that may be developed regarding the electric grid.