A. An owner or operator of an existing mining operation shall submit a permit

application to the director by December 31, 1994. The permit application shall contain

all information required by regulation of the commission, including a proposed

compliance schedule for submission of a closeout plan within the shortest time

practicable. The director shall approve or deny the permit application within six months

after it has been deemed complete.

B. The owner or operator of an existing mining operation shall submit a closeout

plan in accordance with the compliance schedule in the permit. The compliance

schedule in the permit shall require submission of a closeout plan by December 31,

1995 unless the operator shows good cause for a further extension of time. The director

shall approve a modification of a permit for an existing mining operation incorporating a

closeout plan or portion of a closeout plan if:

(1)

the closeout plan and permit application is complete;

(2)

the closeout plan permit fee has been paid and the financial assurance is

adequate and has been provided;

(3)

the closeout plan specifies incremental work to be done within specific

time frames that, if followed, will reclaim the physical environment of the permit area to

a condition that allows for the reestablishment of a self-sustaining ecosystem on the

permit area following closure, appropriate for the life zone of the surrounding areas

unless conflicting with the approved post-mining land use; provided that for purposes of

this section, upon a showing that achieving a post-mining land use or self-sustaining

ecosystem is not technically or economically feasible or is environmentally unsound, the

director may waive the requirement to achieve a self-sustaining ecosystem or post-

mining land use for an open pit or waste unit if measures will be taken to ensure that the

open pit or waste unit will meet all applicable federal and state laws, regulations and

standards for air, surfacewater and ground water protection following closure and will

not pose a current or future hazard to public health or safety; and

(4)

the secretary of environment has provided a written determination in the

form prescribed in Paragraph (2) of Subsection P of Section 7 [69-36-7 NMSA 1978] of

the New Mexico Mining Act.

C. An approval granted pursuant to this section may be revoked or suspended by

order of the director for violation of a provision of the approved closeout plan or permit

for the existing mining operation, an approval condition, a regulation of the commission

or a provision of the New Mexico Mining Act.