A. The commission may approve or otherwise allow to become effective, as

provided in Subsection B of this section, applications from utilities or persons subject to

regulation pursuant to Subsection B of Section 62-6-4 NMSA 1978 or filings by

cooperative utilities pursuant to Section 62-8-7 NMSA 1978, as appropriate, for special

rates or tariffs in order to prevent the loss of customers, to encourage customers to

expand present facilities and operations in New Mexico and to attract new customers

where necessary or appropriate to promote economic development in New Mexico.

Any such special rates or tariffs shall be designed so as to recover at least the

incremental cost of providing service to such customers.

B. The commission may approve or otherwise allow to become effective

applications from utilities or persons subject to regulation pursuant to Subsection B of

Section 62-6-4 NMSA 1978 and filings by cooperative utilities pursuant to Section 62-8-

7 NMSA 1978 for economic development rates and rates designed to retain load for gas

and electric utility customers. For purposes of this section and Section 62-8-6 NMSA

1978, economic development rates and rates designed to retain load are rates set at a

level lower than the corresponding service rate for which a customer would otherwise

qualify.

C. Except as provided in Subsection D of this section, economic development rates

shall be approved or otherwise allowed to become effective for an electric utility or

persons subject to regulation pursuant to Subsection B of Section 62-6-4 NMSA 1978 or

filings by cooperative utilities pursuant to Section 62-8-7 NMSA 1978 only when the

utility or the substantially full requirements supplier of the utility has excess capacity.

For purposes of this section, "excess capacity" means the amount of electric generating

and purchased power capacity available to the utility or such supplier that is greater

than the utility's or such supplier's peak load plus a fixed percentage reserve margin set

by the commission.

D. Economic development rates may be approved or otherwise allowed to become

effective for electric utilities or persons subject to regulation pursuant to Subsection B of

Section 62-6-4 NMSA 1978 or filings by cooperative utilities pursuant to Section 62-8-7

NMSA 1978 that do not meet the qualifications of Subsection C of this section; provided

that the following conditions are met:

(1)

economic development rates approved under this subsection shall not be

lower than the incremental cost of providing service to the economic development rate

customer as determined by the commission. As used in this subsection, "economic

development rate customer" means a customer that directly benefits from the economic

development rate established pursuant to this subsection; and

(2)

an economic development rate approved for any customer under this

subsection shall last no longer than four years, except that the commission may

approve the rate for up to twelve additional months if it finds that the additional period is

necessary to attract a particular economic development rate customer to New Mexico.

E. Prior to July 1, 2035, the commission shall allow public utilities to recover prudent

and reasonable costs incurred by a public utility for the ongoing development,

construction or maintenance of resources for economic development projects that

provide incremental capacity, or serve incremental load growth, within the economic

development project's service area. For economic development projects implemented

after the effective date of this 2025 act, the reasonable costs of economic development

projects shall be recoverable in rates through a rate rider, base rates or a combination

thereof, when the associated equipment and facilities begin serving the new load

associated with the economic development project or the utility demonstrates that the

economic development project provides benefits to existing customers. A public utility

shall be allowed to defer costs incurred for economic development projects that are not

included in rates to a regulatory asset. Notwithstanding the time lines in Subsection C

of Section 62-9-1 NMSA 1978, the commission shall review a public utility's application

for an economic development project and issue a final order approving, modifying or

denying the application within six months of the application filing date; provided,

however, that the commission may extend the time for granting approval for an

additional three months for good cause shown. All projects shall be certified by the

economic development department using industry standard guidelines for site selection

and approved by the commission. All certified and approved projects shall be allowed

to complete construction.

F. The economic development department shall certify, using industry standard

guidelines for site selection, whether the economic development project will support

reasonably anticipated economic development within the state. Prior to the certification,

the department shall provide an opportunity for public comment regarding whether the

proposed economic development project will support reasonably anticipated economic

development within the state. The department shall issue a certification letter within

sixty days of a request from a public utility or project developer, and the certification

letter shall be included in a public utility's application filed pursuant to Subsection E of

this section.

G. For purposes of this section:

(1)

"economic development project" means the construction or modification of

new or existing electric generation facilities, energy storage facilities, transmission and

distribution facilities, zero-carbon resources as defined in Subsection K of Section 62-

16-3 NMSA 1978, alternative fuel facilities, energy efficiency programs, renewable

energy and fuel cell facilities, recycled energy or other technologies necessary to serve

reasonably anticipated new load and that have been certified by the economic

development department pursuant to Subsection F of this section;

(2)

"incremental capacity" means the increase in capacity attributable to new

or expanded facilities up to ten percent of a public utility’s total system peak load per

calendar year;

(3)

"incremental cost" at a minimum shall include all additional costs incurred

to serve the economic development rate customer that would not otherwise have been

incurred to serve other customers, fuel and purchased power costs, costs recoverable

from customers pursuant to the Renewable Energy Act [Chapter 62, Article 16 NMSA

1978] and the Efficient Use of Energy Act [Chapter 62, Article 17 NMSA 1978] and the

direct costs of facilities necessary to provide service to the customer. The commission

shall not impute to the electric utility revenues that would have been received from the

economic development rate or load retention customer if they had been provided

service under the corresponding rate for which they would have otherwise qualified;

(4)

"incremental load growth" means the increase in forecasted load

attributable to commercial and industrial growth or electrification of utility customer

infrastructure; and

(5)

"recycled energy" means energy produced by a generation unit that

converts the otherwise lost energy from exhaust stacks or pipes to electricity without

combustion of additional fossil fuel.