N.M. Stat. § 13-1-124.3
Definitions
Text of § 13-1-124.3
As used in the Educational Facility Construction Manager At Risk Act [13-1-124.1 to
13-1-124.5 NMSA 1978]:
A. "construction manager at risk" means a person who, pursuant to a contract with a
governing body, provides the preconstruction services and construction management
required in a construction manager at risk delivery method;
B. "construction manager at risk delivery method" means a construction method for
an educational facility wherein a construction manager at risk provides a range of
preconstruction services and construction management, including cost estimation and
consultation regarding the design of the building project, preparation and coordination of
bid packages, scheduling, cost control, value engineering and, while acting as the
general contractor during construction, detailing the trade contractor scope of work,
holding the trade contracts and other subcontracts, prequalifying and evaluating trade
contractors and subcontractors and providing management and construction services,
all at a guaranteed maximum price for which the construction manager at risk is
financially responsible;
C. "educational facility" means a public school, including a locally chartered or state-
chartered charter school or a facility of a state educational institution listed in Section 6-
17-1.1 NMSA 1978;
D. "governing body" means:
(1)
the public school facilities authority if the authority is the using agency that
requires the construction of an educational facility;
(2)
a local school board if the board is the using agency that requires the
construction of an educational facility;
(3)
the governing body of a charter school if the governing body is the using
agency that requires the construction of an educational facility; or
(4)
the governing body of a state educational institution if the governing body
is the using agency that requires the construction of an educational facility; and
E. "guaranteed maximum price" means the maximum amount to be paid by the
governing body for the construction of the educational facility, including the cost of the
work, the general conditions and the fees charged by the construction manager at risk.