LawCensus
Nevada Revised Statutes

Nev. Rev. Stat. § 445A.580

Continuing planning process

Nev. Rev. Stat. § 445A.580 · Last amended 1985 · Text from the 2026.09.1 snapshot

Text of § 445A.580

The Department shall establish a continuing planning process consistent with all applicable federal requirements which results in plans for all waters of the State and includes:

1. Adequate effluent limitations and schedules of compliance;

2. The incorporation of all elements of any applicable areawide plans for management of waste and plans for basins under NRS 445A.300 to 445A.730, inclusive;

3. Total maximum daily load for pollutants and contaminants;

4. Procedures for revision of the plans;

5. Adequate authority for intergovernmental cooperation;

6. Adequate implementation, including schedules of compliance, for revised or new standards of water quality;

7. Controls over the disposition of all residual waste from any treatment of water;

8. An inventory and ranking, in order of priority, of needs for construction of treatment works; and

9. Controls over the injection of fluids through a well to prevent the degradation of underground water.

(Added to NRS by 1973, 1713; A 1985, 767)

Cite this section

Nev. Rev. Stat. § 445A.580

https://lawconsensus.com/codes/nevada/title-40/445a-580/

LawCensus reproduces the text of the law for reference. It may not show the most recent changes. Check the official source before you rely on it: official text. This is general information, not legal advice.