LawCensus
Nebraska Revised Statutes

Neb. Rev. Stat. § 39-1818

Neb. Rev. Stat. § 39-1818 · Last amended 2008 · Text from the 2026.09.1 snapshot

Text of § 39-1818

A water impoundment structure which will result in temporary storage and flowage of water upon, across, or adjacent to a road upstream from such structure may be approved only if such road would not be inundated because of the storage in such structure of waters from a ten-year, twenty-four-hour or lesser frequency storm. A water impoundment structure which will also serve as a roadbed may be approved and constructed only if the structure would contain the runoff from a twenty-five-year, twenty-four-hour frequency storm without water overtopping such structure or being discharged through its emergency spillway, except that if the road which is subject to such inundation is classified as a local road or remote residential road with current average daily traffic of fifty vehicles or less, the containment of a ten-year, twenty-four-hour frequency storm shall be sufficient. In making the storm frequency determinations required by this section, any recognized method may be used.

Laws 1979, LB 265, § 2;

Laws 1988, LB 903, § 2;

Laws 2008, LB1068, § 3.

Cite this section

Neb. Rev. Stat. § 39-1818

https://lawconsensus.com/codes/nebraska/chapter-39/39-1818/

LawCensus reproduces the text of the law for reference. It may not show the most recent changes. Check the official source before you rely on it: official text. This is general information, not legal advice.