765 ILCS 530/5
Text of § 5
(765 ILCS 530/5) (from Ch. 96 1/2, par. 9655) Sec. 5. Discussion. The operator, or his agent shall, if the surface owner accepts the offer to discuss, be available at the time agreed, date and place to discuss with the surface owner the following: (A) Placement of roads to be constructed by operator. (B) Points of entry upon the surface for drilling operations. (C) Construction and placement of pits used for drilling operations. (D) Restoration of fences to be cut in order to make entry upon the surface for drilling operations. (E) Use of waters on the surface of the lands. (F) Removal of trees. (G) Surface water drainage changes caused by drilling operations. (Source: P.A. 85-1312.)
Cite this section
765 ILCS 530/5
https://lawconsensus.com/codes/illinois/chapter-765/765-530-5/
LawCensus reproduces the text of the law for reference. It may not show the most recent changes. Check the official source before you rely on it: official text. This is general information, not legal advice.