LawCensus
Illinois Compiled Statutes

5 ILCS 615/6

5 ILCS 615/6 · Last amended 1941 · Text from the 2026.09.1 snapshot

Text of § 6

(5 ILCS 615/6) (from Ch. 96 1/2, par. 5006) Sec. 6. Permits shall require the immediate commencement of geological, geophysical or core drilling operation thereunder. All operations shall be prosecuted with reasonable diligence in accordance with good oil field practice, and shall be continuous except when causes beyond the control of the permittee intervene and render continuous operations not feasible. In no case shall such geological, geophysical or core drilling operations include the actual operation of drilling for gas, oil or other mineral deposits. (Source: Laws 1941, vol. 1, p. 943.)

Cite this section

5 ILCS 615/6

https://lawconsensus.com/codes/illinois/chapter-5/5-615-6/

LawCensus reproduces the text of the law for reference. It may not show the most recent changes. Check the official source before you rely on it: official text. This is general information, not legal advice.