LawCensus
Illinois Compiled Statutes

415 ILCS 5/3.350

415 ILCS 5/3.350 · Last amended 2007 · Text from the 2026.09.1 snapshot

Text of § 3.350

(415 ILCS 5/3.350) (was 415 ILCS 5/3.58) Sec. 3.350. Potential route. "Potential route" means abandoned and improperly plugged wells of all kinds, drainage wells, all injection wells, including closed loop heat pump wells, and any excavation for the discovery, development or production of stone, sand or gravel. This term does not include closed loop heat pump wells using USP food grade propylene glycol. A new potential route is: (1) a potential route which is not in existence or for which construction has not commenced at its location as of January 1, 1988, or (2) a potential route which expands laterally beyond the currently permitted boundary or, if the potential route is not permitted, the boundary in existence as of January 1, 1988. Construction shall be deemed commenced when all necessary federal, State and local approvals have been obtained, and work at the site has been initiated and proceeds in a reasonably continuous manner to completion. (Source: P.A. 94-1048, eff. 1-1-07.)

Cite this section

415 ILCS 5/3.350

https://lawconsensus.com/codes/illinois/chapter-415/415-5-3-350/

LawCensus reproduces the text of the law for reference. It may not show the most recent changes. Check the official source before you rely on it: official text. This is general information, not legal advice.