Act 720
Illinois Compiled Statutes, Chapter 225, § 1.01 to § 9.09. 93 sections.
- § 1.01(225 ILCS 720/1.01) (from Ch. 96 1/2, par. 7901.01) Sec. 1.01. Short Title. This Act may be cited as the Surface Coal Mining Land Conservation and Reclamation Act. (Source: P.A. 86-1475.)
- § 1.02(225 ILCS 720/1.02) (from Ch. 96 1/2, par. 7901.02) Sec. 1.02. Legislative Declaration. (a) It is declared to be the policy of this State to provide for conservation and reclamation of lands affected by surface and under…
- § 1.03(225 ILCS 720/1.03) (from Ch. 96 1/2, par. 7901.03) Sec. 1.03. Definitions. (a) Whenever used or referred to in this Act, unless a different meaning clearly appears from the context: (1) "Affected land" means: (A) in the…
- § 1.04Repealed
- § 1.05(225 ILCS 720/1.05) (from Ch. 96 1/2, par. 7901.05) Sec. 1.05. Interagency Committee. There is created the Interagency Committee on Surface Mining Control and Reclamation, which shall consist of the Director (or Division…
- § 1.06(225 ILCS 720/1.06) (from Ch. 96 1/2, par. 7901.06) Sec. 1.06. Scope of the Act. This Act shall apply to all mining operations, except: (a) the private non-commercial extraction of coal by a landowner or lessee where 250…
- § 1.07(225 ILCS 720/1.07) (from Ch. 96 1/2, par. 7901.07) Sec. 1.07. Construction. As provided in Section 1.02, this Act shall be construed to fully comply and be consistent with the requirements of the Federal Surface Mining …
- § 2.01(225 ILCS 720/2.01) (from Ch. 96 1/2, par. 7902.01) Sec. 2.01. Necessity of a Permit. It shall be unlawful for any person to engage in mining operations subject to the provisions of this Act without first obtaining from …
- § 2.02(225 ILCS 720/2.02) (from Ch. 96 1/2, par. 7902.02) Sec. 2.02. Contents of Permit Application. (a) Each permit application, and each application for revision of a permit, submitted under this Act shall contain all inform…
- § 2.03(225 ILCS 720/2.03) (from Ch. 96 1/2, par. 7902.03) Sec. 2.03. Reclamation Plan. (a) Each permit application shall include a reclamation plan which meets all requirements which the Department by rule prescribes. Such rul…
- § 2.04(225 ILCS 720/2.04) (from Ch. 96 1/2, par. 7902.04) Sec. 2.04. Notice and Public Review of Applications. (a) At the time of submission of a permit application, the applicant shall (1) place a public notice of the applica…
- § 2.05(225 ILCS 720/2.05) (from Ch. 96 1/2, par. 7902.05) Sec. 2.05. Application Fee. At the time of submission to the Department, a permit application shall be accompanied by a fee based on the number of surface acres of land…
- § 2.06(225 ILCS 720/2.06) (from Ch. 96 1/2, par. 7902.06) Sec. 2.06. Duration of Permit. (a) A permit entitles the permittee to engage in the mining operations described in the permit for the period determined by the Departmen…
- § 2.07(225 ILCS 720/2.07) (from Ch. 96 1/2, par. 7902.07) Sec. 2.07. Renewals. (a) Any valid permit issued under this Act shall carry with it the right of successive renewal on expiration of the permit term with respect to the…
- § 2.08(225 ILCS 720/2.08) (from Ch. 96 1/2, par. 7902.08) Sec. 2.08. Standards for approval of permits and revisions. (a) On the basis of a complete application, or a revision thereof, and after completion of the procedures re…
- § 2.09(225 ILCS 720/2.09) (from Ch. 96 1/2, par. 7902.09) Sec. 2.09. Permit Revision. (a) During the term of the permit the permittee may submit an application for revision of a permit. The Department shall by rule establish g…
- § 2.10(225 ILCS 720/2.10) (from Ch. 96 1/2, par. 7902.10) Sec. 2.10. Periodic Review of Permits. The Department shall review outstanding permits and may require reasonable revision or modification of the permit provisions duri…
- § 2.11(225 ILCS 720/2.11) (from Ch. 96 1/2, par. 7902.11) Sec. 2.11. Procedures for Approval. (a) If a hearing has been held under Section 2.04, the Department shall within 60 days after the last such hearing make its decision…
- § 3.01(225 ILCS 720/3.01) (from Ch. 96 1/2, par. 7903.01) Sec. 3.01. General Requirement. Each person conducting surface mining operations shall as a minimum comply with all applicable performance standards set forth in this A…
- § 3.02(225 ILCS 720/3.02) (from Ch. 96 1/2, par. 7903.02) Sec. 3.02. Coal Utilization. Surface mining operations shall be conducted so as to maximize the utilization and conservation of the solid fuel resource being recovered …
- § 3.03(225 ILCS 720/3.03) (from Ch. 96 1/2, par. 7903.03) Sec. 3.03. Land Use. Affected land shall be restored to a condition capable of supporting the uses which it was capable of supporting prior to any mining, or higher or …
- § 3.04(225 ILCS 720/3.04) (from Ch. 96 1/2, par. 7903.04) Sec. 3.04. Grading. (a) Affected land shall be backfilled, compacted (where advisable to insure stability or to prevent leaching of toxic materials), and graded in orde…
- § 3.05(225 ILCS 720/3.05) (from Ch. 96 1/2, par. 7903.05) Sec. 3.05. Stabilization. All surface areas, including spoil piles, affected by the surface mining and reclamation operation shall be stabilized and protected to effect…
- § 3.06(225 ILCS 720/3.06) (from Ch. 96 1/2, par. 7903.06) Sec. 3.06. Topsoil. (a) The topsoil shall be removed from the land in a separate layer, replaced on the backfill area, or if not used immediately, segregated in a separ…
- § 3.07(225 ILCS 720/3.07) (from Ch. 96 1/2, par. 7903.07) Sec. 3.07. Prime Farmlands and High Capability Lands. (a) For all prime farmlands to be mined and reclaimed, the operator shall, as a minimum, (1) segregate the A horiz…
- § 3.08(225 ILCS 720/3.08) (from Ch. 96 1/2, par. 7903.08) Sec. 3.08. Runoff Water. (a) All runoff water from affected areas shall be impounded, drained, or treated so as to reduce soil erosion, damage to unmined lands, and pol…
- § 3.09(225 ILCS 720/3.09) (from Ch. 96 1/2, par. 7903.09) Sec. 3.09. Augering. Any augering operation associated with surface mining shall be conducted in a manner to maximize recoverability of mineral reserves remaining after…
- § 3.10(225 ILCS 720/3.10) (from Ch. 96 1/2, par. 7903.10) Sec. 3.10. Hydrology. (a) Disturbances to the prevailing hydrologic balance at the mine-site and in associated offsite areas and to the quality and quantity of water in…
- § 3.11(225 ILCS 720/3.11) (from Ch. 96 1/2, par. 7903.11) Sec. 3.11. Wastes. (a) With respect to surface disposal of mine wastes, tailings, coal processing wastes, and other wastes in areas other than the mine working or excav…
- § 3.12(225 ILCS 720/3.12) (from Ch. 96 1/2, par. 7903.12) Sec. 3.12. Nearby Mines. Surface mining shall not be permitted within five hundred feet from active and abandoned underground mines except as provided in this Section. …
- § 3.13(225 ILCS 720/3.13) (from Ch. 96 1/2, par. 7903.13) Sec. 3.13. Explosives. (a) Explosives shall be used only in accordance with existing State and Federal law and rules promulgated by the Department. Such rules shall inc…
- § 3.14(225 ILCS 720/3.14) (from Ch. 96 1/2, par. 7903.14) Sec. 3.14. Roads and Ditches. (a) The construction, maintenance, and postmining conditions of roads into and across the site of mining operations shall control or preve…
- § 3.15(225 ILCS 720/3.15) (from Ch. 96 1/2, par. 7903.15) Sec. 3.15. Vegetation. (a) A suitable, diverse, effective, and permanent vegetative cover of the same seasonal variety native to the area of affected land shall be esta…
- § 3.16(225 ILCS 720/3.16) (from Ch. 96 1/2, par. 7903.16) Sec. 3.16. Offsite Areas. (a) Offsite areas shall be protected from slides or damage occurring during surface mining and reclamation operations. (b) Surface mining oper…
- § 3.17(225 ILCS 720/3.17) (from Ch. 96 1/2, par. 7903.17) Sec. 3.17. Excess Spoil. All excess spoil material resulting from surface mining and reclamation activities shall be placed in such a manner that: (a) spoil is transpor…
- § 3.18(225 ILCS 720/3.18) (from Ch. 96 1/2, par. 7903.18) Sec. 3.18. Fish, Wildlife, and Related Environmental Values. To the extent possible using the best technology currently available, the operator shall minimize disturban…
- § 3.19(225 ILCS 720/3.19) (from Ch. 96 1/2, par. 7903.19) Sec. 3.19. Natural Barriers. An undisturbed natural barrier shall be provided beginning at the elevation of the lowest coal seam to be mined and extending from the outs…
- § 3.20(225 ILCS 720/3.20) (from Ch. 96 1/2, par. 7903.20) Sec. 3.20. Illinois Environmental Protection Act. All requirements of the Illinois Environmental Protection Act, and of rules and regulations thereunder, shall be compl…
- § 3.21(225 ILCS 720/3.21) (from Ch. 96 1/2, par. 7903.21) Sec. 3.21. Signs. Each permittee shall conspicuously maintain at each entrance to the surface mining and reclamation operations a clearly visible sign which sets forth …
- § 3.22(225 ILCS 720/3.22) (from Ch. 96 1/2, par. 7903.22) Sec. 3.22. Other Criteria. The operator shall meet such other criteria required by the Department for a particular site as are necessary to achieve reclamation in accor…
- § 3.23(225 ILCS 720/3.23) (from Ch. 96 1/2, par. 7903.23) Sec. 3.23. Steep-Slope Mining. (a) This Section applies to steep-slope surface mining. A steep slope is a slope greater than 20 degrees. The standards set forth in this…
- § 3.24(225 ILCS 720/3.24) (from Ch. 96 1/2, par. 7903.24) Sec. 3.24. Water Rights. (a) Nothing in this Act shall be construed as affecting in any way the right of any person to enforce or protect, under applicable law, his int…
- § 3.25(225 ILCS 720/3.25) (from Ch. 96 1/2, par. 7903.25) Sec. 3.25. Timing of Reclamation. (a) Reclamation efforts on all land that is disturbed by surface mining operations shall proceed in an environmentally sound manner an…
- § 3.26(225 ILCS 720/3.26) (from Ch. 96 1/2, par. 7903.26) Sec. 3.26. Variances for Joint Surface and Underground Mining. (a) Where the applicant proposes to combine surface mining operations with underground mining operations …
- § 4.01(225 ILCS 720/4.01) (from Ch. 96 1/2, par. 7904.01) Sec. 4.01. General Requirement. Each person conducting underground mining operations shall as a minimum comply with all applicable performance standards set forth in th…
- § 4.02(225 ILCS 720/4.02) (from Ch. 96 1/2, par. 7904.02) Sec. 4.02. Subsidence. Each operator shall adopt measures consistent with known technology in order to prevent subsidence causing material damage to the extent technolo…
- § 4.03(225 ILCS 720/4.03) (from Ch. 96 1/2, par. 7904.03) Sec. 4.03. Sealing Openings. All portals, entryways, drifts, shafts, or other openings between the surface and underground mine working shall be sealed when no longer n…
- § 4.04(225 ILCS 720/4.04) (from Ch. 96 1/2, par. 7904.04) Sec. 4.04. Exploratory Holes. All exploratory holes no longer necessary for underground mining shall be filled or sealed, maximizing to the extent technologically and e…
- § 4.05(225 ILCS 720/4.05) (from Ch. 96 1/2, par. 7904.05) Sec. 4.05. Wastes. (a) With respect to surface disposal of mine wastes, tailings, coal processing wastes, and other wastes in areas other than the mine workings or exca…
- § 4.06(225 ILCS 720/4.06) (from Ch. 96 1/2, par. 7904.06) Sec. 4.06. Vegetation. On regraded areas and all other lands affected, there shall be established a diverse and permanent vegetative cover capable of self-regeneration …
- § 4.07(225 ILCS 720/4.07) (from Ch. 96 1/2, par. 7904.07) Sec. 4.07. Offsite Areas. Offsite areas shall be protected from damages which may result from underground mining operations. (Source: P.A. 81-1015.)
- § 4.08(225 ILCS 720/4.08) (from Ch. 96 1/2, par. 7904.08) Sec. 4.08. Hazards. Fire hazards and other conditions which constitute a hazard to health and safety of the public shall be eliminated. (Source: P.A. 81-1015.)
- § 4.09(225 ILCS 720/4.09) (from Ch. 96 1/2, par. 7904.09) Sec. 4.09. Hydrology. The operator shall minimize the disturbances of the prevailing hydrologic balance at the minesite and in associated offsite areas and to the quant…
- § 4.10(225 ILCS 720/4.10) (from Ch. 96 1/2, par. 7904.10) Sec. 4.10. Suspension of Operations in Urbanized Areas. In order to protect the stability of the land, the Department shall suspend underground coal mining operations u…
- § 4.11(225 ILCS 720/4.11) (from Ch. 96 1/2, par. 7904.11) Sec. 4.11. Other Impacts. (a) With respect to other surface impacts of underground mining operations not specified in this Article, including but not limited to the con…
- § 5.01(225 ILCS 720/5.01) (from Ch. 96 1/2, par. 7905.01) Sec. 5.01. Exploration Rules. This Article applies to coal exploration operations which substantially disturb the natural land surface. Such operations shall be conduct…
- § 5.02(225 ILCS 720/5.02) (from Ch. 96 1/2, par. 7905.02) Sec. 5.02. Notice. The Department's coal exploration rules shall provide that prior to conducting coal exploration operations a notice of intention to explore shall be …
- § 5.03(225 ILCS 720/5.03) (from Ch. 96 1/2, par. 7905.03) Sec. 5.03. Approval. The Department's coal exploration rules shall provide that prior to conducting any coal exploration in which at least 250 tons of coal will be remo…
- § 5.04(225 ILCS 720/5.04) (from Ch. 96 1/2, par. 7905.04) Sec. 5.04. Performance Standards. The Department's coal exploration rules shall require reclamation in accordance with the performance standards in Article III and IV o…
- § 5.05(225 ILCS 720/5.05) (from Ch. 96 1/2, par. 7905.05) Sec. 5.05. Confidential Information. Information submitted to the Department under this Article as confidential concerning trade secrets or privileged commercial or fin…
- § 5.06(225 ILCS 720/5.06) (from Ch. 96 1/2, par. 7905.06) Sec. 5.06. Penalties. Any person who conducts any coal exploration activities which substantially disturb the natural land surface in violation of this Article shall be…
- § 6.01(225 ILCS 720/6.01) (from Ch. 96 1/2, par. 7906.01) Sec. 6.01. Requirement of a Bond. (a) After a mining and reclamation permit application has been approved but before a permit is issued, the applicant shall file with t…
- § 6.02(225 ILCS 720/6.02) (from Ch. 96 1/2, par. 7906.02) Sec. 6.02. Amount of Bond. The amount of the bond shall be determined by the Department. It shall be sufficient to assure the completion of the reclamation plan specifi…
- § 6.03(225 ILCS 720/6.03) (from Ch. 96 1/2, par. 7906.03) Sec. 6.03. Duration of Bond. (a) Liability under the bond shall be for the duration of the mining operations and reclamation, and for a period coincident with the opera…
- § 6.04(225 ILCS 720/6.04) (from Ch. 96 1/2, par. 7906.04) Sec. 6.04. Cancellation. A bond with separate surety filed in accordance with this Article shall not be cancelled by the surety except after not less than 90 days notic…
- § 6.05(225 ILCS 720/6.05) (from Ch. 96 1/2, par. 7906.05) Sec. 6.05. Alternatives to a Bond. In lieu of a performance bond, the operator may deposit as security cash, negotiable government securities, or negotiable certificate…
- § 6.06(225 ILCS 720/6.06) (from Ch. 96 1/2, par. 7906.06) Sec. 6.06. Changes in Amount of Bond. The amount of the bond or cash and securities shall be increased or reduced from time to time as the land affected by mining opera…
- § 6.07(225 ILCS 720/6.07) (from Ch. 96 1/2, par. 7906.07) Sec. 6.07. Forfeiture. (a) The Attorney General, on request of the Department, shall institute proceedings to have the bond of the operator forfeited for violation by t…
- § 6.08(225 ILCS 720/6.08) (from Ch. 96 1/2, par. 7906.08) Sec. 6.08. Release of bonds. (a) A permittee may file a request with the Department for the release of all or part of a performance bond or deposit. Within 30 days afte…
- § 7.01(225 ILCS 720/7.01) (from Ch. 96 1/2, par. 7907.01) Sec. 7.01. Prohibited Mining. (a) No person shall cause or allow any mining operations which will adversely affect any publicly owned park or places included in the Nat…
- § 7.02(225 ILCS 720/7.02) (from Ch. 96 1/2, par. 7907.02) Sec. 7.02. Criteria for Designating Lands Unsuitable for Mining Operations. (a) An area shall be designated as unsuitable for all or certain types of mining operations …
- § 7.03(225 ILCS 720/7.03) (from Ch. 96 1/2, par. 7907.03) Sec. 7.03. Procedure for designation. (a) Any person having an interest which is or may be adversely affected shall have the right to petition the Department to have an…
- § 7.04(225 ILCS 720/7.04) (from Ch. 96 1/2, par. 7907.04) Sec. 7.04. Land Report. (a) The Department shall prepare a Land Report with respect to each petition filed with the Department under Section 7.03. Each Land Report shal…
- § 7.05(225 ILCS 720/7.05) (from Ch. 96 1/2, par. 7907.05) Sec. 7.05. Construction. The provisions of this Article, including the provisions of subsection (e) of Section 7.01 and subsection (e) of Section 7.02, shall be constru…
- § 8.01(225 ILCS 720/8.01) (from Ch. 96 1/2, par. 7908.01) Sec. 8.01. Inspection. (a) The Department, including its authorized representatives, without advance notice and on presentation of appropriate credentials (1) may enter…
- § 8.02(225 ILCS 720/8.02) (from Ch. 96 1/2, par. 7908.02) Sec. 8.02. Records. (a) In accordance with rules adopted by the Department, each permittee shall (1) establish and maintain appropriate records, (2) make monthly report…
- § 8.03(225 ILCS 720/8.03) (from Ch. 96 1/2, par. 7908.03) Sec. 8.03. Violation Reports. Each inspector, on detection of each violation of any requirement of this Act or a permit, shall forthwith inform the operator in writing,…
- § 8.04(225 ILCS 720/8.04) (from Ch. 96 1/2, par. 7908.04) Sec. 8.04. Civil and Criminal Penalties. (a) Any permittee who violates any permit condition or who violates any provision of this Act or rules adopted under this Act, …
- § 8.05(225 ILCS 720/8.05) (from Ch. 96 1/2, par. 7908.05) Sec. 8.05. Civil Actions. (a) Any person having an interest which is or may be adversely affected may commence a civil action on his own behalf to compel compliance wit…
- § 8.06(225 ILCS 720/8.06) (from Ch. 96 1/2, par. 7908.06) Sec. 8.06. Enforcement Procedures. (a) Whenever, on the basis of any information available to it, including receipt of information from any person, the Department has r…
- § 8.07(225 ILCS 720/8.07) (from Ch. 96 1/2, par. 7908.07) Sec. 8.07. Administrative Review. (a) A permittee issued a notice or order by the Department under Section 8.06, or any person having an interest which is or may be adv…
- § 8.08(225 ILCS 720/8.08) (from Ch. 96 1/2, par. 7908.08) Sec. 8.08. Judicial Relief. The Department may request the Attorney General to institute a civil action for relief, including a temporary restraining order or a prelimi…
- § 8.09(225 ILCS 720/8.09) (from Ch. 96 1/2, par. 7908.09) Sec. 8.09. Hearings. Any party to a hearing conducted under Sections 2.11 (c), 7.03 (c), 8.04, 8.06 or 8.07 may be represented by counsel, make oral or written argument…
- § 8.10(225 ILCS 720/8.10) (from Ch. 96 1/2, par. 7908.10) Sec. 8.10. Review under Administrative Review Law. All final administrative decisions of the Department under this Act shall be subject to judicial review pursuant to t…
- § 9.01(225 ILCS 720/9.01) (from Ch. 96 1/2, par. 7909.01) Sec. 9.01. Rules. (a) The Department may propose, adopt and promulgate reasonable rules in conformity with this Act. When it proposes or adopts rules the Department sha…
- § 9.02(225 ILCS 720/9.02) (from Ch. 96 1/2, par. 7909.02) Sec. 9.02. General Duties and Powers. In addition to the duties and powers of the Department prescribed by the Civil Administrative Code of Illinois, the Department sha…
- § 9.03(225 ILCS 720/9.03) (from Ch. 96 1/2, par. 7909.03) Sec. 9.03. Cooperative agreements. The Department may enter into cooperative agreements with the United States Secretary of the Interior under which the State will regu…
- § 9.04(225 ILCS 720/9.04) (from Ch. 96 1/2, par. 7909.04) Sec. 9.04. Delegation to other agencies. The Department may delegate responsibilities, other than final action on permits, to other State agencies with the authority an…
- § 9.05(225 ILCS 720/9.05) (from Ch. 96 1/2, par. 7909.05) Sec. 9.05. Coordination with other agencies. The Department shall work with other agencies to coordinate, simplify and expedite the procedures required to obtain permit…
- § 9.06(225 ILCS 720/9.06) (from Ch. 96 1/2, par. 7906.06) Sec. 9.06. Financial Interest. No person employed by the Department performing any function or duty under this Act shall have a direct or indirect financial interest in…
- § 9.07(225 ILCS 720/9.07) (from Ch. 96 1/2, par. 7909.07) Sec. 9.07. Fees and Forfeitures. (a) All fees and civil penalties collected under this Act shall be deposited into the Coal Mining Regulatory Fund in the State Treasury…
- § 9.08(225 ILCS 720/9.08) (from Ch. 96 1/2, par. 7909.08) Sec. 9.08. Transition. The Department shall provide for the orderly transition from "The Surface-Mined Land Conservation and Reclamation Act", approved September 17, 19…
- § 9.09(225 ILCS 720/9.09) (from Ch. 96 1/2, par. 7909.09) Sec. 9.09. This Act takes effect on June 1, 1980. (Source: P.A. 81-1015.)